CHANGE ORDER

52' 1984 Spindrift Motoryacht

$169,000.00

Last Updated: 2025-04-29

If you are looking for a clean, well maintained and and updated vessel for comfortable cruising or living on board this is the boat you should see.

Call listing broker below for a showing of this excellent value:

Make: Spindrift
Model: Motoryacht
Year: 1984
Length: 52ft

Name: CHANGE ORDER
Hull Material: Fiberglass
Engine/Fuel Type:
Located In: Emeryville - Our Docks, CA

  • Details
  • Dimensions
  • Engines
  • Tanks
  • Accommodations
  • Category: Power
  • Class: Motor Yachts
  • Length Overall: 52 ft
  • Beam: 15.25 ft
  • Draft: 4 ft
  • Dry Weight: 40,000 lb

Engine 1

  • Make: Volvo Diesel
  • Model: TAMD 70E
  • DriveTransmissionDescription: Direct
  • Fuel: diesel
  • EnginePower: 305|horsepower
  • Type: Inboard
  • PropellerType: 3 Blade, Bronze
  • Year: 1984
  • Hours: 1400
  • BoatEngineLocationCode: Port

Engine 2

  • Make: Volvo Diesel
  • Model: TAMD 70E
  • DriveTransmissionDescription: Direct
  • Fuel: diesel
  • EnginePower: 305|horsepower
  • Type: Inboard
  • PropellerType: 3 Blade, Bronze
  • Year: 1984
  • Hours: 1400
  • BoatEngineLocationCode: Starboard
  • Fuel Tank: 400|gallon
  • Water Tank: 305|gallon
  • Holding Tank: 50|gallon
  • Cabins: 3
  • Heads: 2

Additional Descriptions

Accommodations

CHANGE ORDER features a 2/3 cabin configuration. The forward cabin has two sets of upper and lower bunks with a sliding portition that converts the large lounge into two smaller staterooms. There is a private head with a Vacuflush head, sink and stall shower that services the forward stateroom.

There is a spacious galley aft of the forward stateroom and opposite the galley is a large U shaped dinette. The galley is equipped with a 4 burner propane stove, built in microwave, large SS sink, and abundant food and dish storage. There is a household size side by side refridgerator / freezer. The galley and dinette are situated just below the forward windows which gives the area plenty of light. The galley and dinette area have a teak and holly sole.

The salon is furnished with a large L shaped custom leather sofa/sleeper. There are two doors from the outside that access the salon. One door is a large slider to starboard and the other is from the aft sundeck that spirals down to the salon with teak rails. Sliding windows surround the salon and give the area brightness and fresh air. There are blinds on all the salon windows.

The aft cabin is very comfortable and spacious. The aft cabin is trimmed in teak with teak and holly floors and nice teak framed mirrors. There is a centerline queen bed surrounded by teak cabinetry and hanging lockers. In one of the hanging lockers is a fold out ironing table made of teak. Situated on the side of the aft cabin is a small teak desk and chair with a vanity. The aft head compartment also has a Vacuflush head and a stall shower. There is a laundry closet with a brand new a washer and dryer.

The large aft deck is fully enclosed with a full set of comfortable rattan furniture.

  • L shaped custom leather sofa
  • Flat screen TV
  • Electric fireplace
  • Fully carpeted main salon & Staterooms
  • Teak & Holly sole in galley and dinette area
  • Lower Helm station
  • Large windows for open viewing and plenty of natural lighting.
  • Surround sound speakers for radio,cd and dvd enjoyment
  • Central reverse cycle heat & air conditioning
  • Brand new Washer / Dryer
Galley

With more space than many condos and apartments, CHANGE ORDER offers all of the comforts of home with plenty of storage and counter-space to prepare, cook, and serve gourmet meals, while sitting at the dock, anchored in secluded island cove, or cruising off-shore. The galley features a full size Side-by-Side Refrigerator / freezer

Opposite the galley is a large built-in dinette with storage under the comfortable seating. Large windows above flood the space plenty of natural light. While the galley and dinette area is down and forward of the salon, it is not isolated due to an open area between the dinette and salon. The entire area has beautiful teak & holly soles.

  • New Magic Chef Propane Oven and 3 burner Stove Top
  • Amana Side By Side Refrigerator/Freezer with in-door water / ice
  • Expansive Corian Countertops
  • Microwave / Convection Oven
  • Large Sink
  • Teak & Holly soles
  • Direct & Indirect Lighting
Dinette
  • Great U-shaped dinette for 6 people directly across from the galley.
  • Features drop down teak table, converts to another sleeping area
  • Large cabinet for wine storage and glasses
  • Teak and Holly flooring
  • Large windows above
Master Stateroom

The huge all teak master stateroom is aft and it features a centerline queen sized berth. All of the walls are teak in perfect condition. There are numerous hanging lockers and drawers for clothing storage. The stateroom has an en-suite head with a Vacuflush toilet, Corian counters and a tub / shower with a sliding glass door. The washer dryer closet is adjacent to the doorway leading in to the master stateroom.

  • Master with full queen walk around
  • Large Hanging Closets and plenty of drawers
  • All of the walls are finished in Teak and show like brand new
  • Ceiling features hatches for fresh air as well as natural light prizms
  • En-Suite Head features Vacuflush toilet, Corian countertops with sink, large shower with tub behind sliding glass door.
  • Direct and Indirect Lighting
Guest Staterooms

Forward is a large den / lounge with two luxurious sofas that face each other. The space can serve as one large guest stateroom or be converted to two staterooms featuring double beds with pullman style bunks above both. They are located on port and starboard side of the space and a sliding teak partition door can be closed to divide the space.

Disclaimer

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. Buyer should assume that items on the vessel at the time of viewing, but not specifically listed on this specification sheet, are not included with the sale of the yacht, and should instruct his agents, or his surveyors to investigate such details as the buyer desires validated. Buyer assumes responsibility to verify all speeds, consumptions, capacities and other measurements contained herein and otherwise provided, and agrees to instruct his surveyor to confirm such details prior to purchase. This vessel is subject to sale, price and inventory changes, and withdrawal from market without notice.